DSpace Repository

A measured delay in the migration of adult chinook salmon at Bonneville Dam on the Columbia River

Show simple item record

dc.date 2006-08-25T23:02:27Z
dc.date 2006-08-25T23:02:27Z
dc.date 1956
dc.date.accessioned 2013-10-16T07:39:55Z
dc.date.available 2013-10-16T07:39:55Z
dc.date.issued 2013-10-16
dc.identifier http://ir.library.oregonstate.edu/dspace/bitstream/1957/2983/1/Delay_Migration_Chinook_Salmon_ocr.pdf
dc.identifier http://hdl.handle.net/1957/2983
dc.identifier.uri http://koha.mediu.edu.my:8181/xmlui/handle/1957/2983
dc.description A study was undertaken in the fall of 1948 by the Oregon Fish Commission to determine the possible presence and importance of a delay in the migration of adult chinook salmon (Oncorhynchus tshawytscha) at Bonneville Dam on the Columbia River. Approximately 650 chinook were captured, tagged, and released at the Oneonta trap 6.7 miles below Bonneville Dam and 200 were handled similarly at the dam and released above. The tag returns from Celilo Falls, the main commercial fishing area, 60 miles above Bonneville, were compared by location of tagging with regard to date of tagging and the number of days en route. The linear correlation between tagging date and days out was significant for the 39 recoveries tagged at Bonneville but not for the 35 from Oneonta. The later in the season the fish were tagged at Bonneville the more rapidly they migrated to Celilo Falls. With no adjustment for the difference in distance between the two tagging locations, the fish from Oneonta took a significant 3.4 days longer to make the trip to Celilo than the Bonneville tagged fish. When correcting for the distance difference, the delay was reduced to 3.0 or 2.6 days, either of which was still significant. Although the number of recoveries is small, all of those used are believed to be reliable and sufficient for statistical analysis. The study represents only one year's work and investigations of another year may refute or substantiate these findings.
dc.language en_US
dc.publisher Portland, Or. : Fish Commission of Oregon
dc.relation Contribution (Oregon. Fish Commission)
dc.relation no. 23.
dc.relation Reports and Publications -- Other Reports and Publications
dc.subject Thematic Classification -- Plants and Animals -- Fish -- Anadromous Fish -- Chinook Salmon
dc.subject Thematic Classification -- Plants and Animals -- Fish -- Anadromous Fish -- Chinook Salmon -- Fish Passage
dc.title A measured delay in the migration of adult chinook salmon at Bonneville Dam on the Columbia River
dc.type Technical Report


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account