Reactive repair of a disrupted schedule is a better alternative to total rescheduling, as the latter is a time consuming process and also results in shop floor nervousness. The schedule repair heuristics reported in the literature generally address only machine breakdown. This paper presents a modified Affected Operations Rescheduling (mAOR) approach, which deals with many of the disruptions that are frequently encountered in a job shop. The repair of these disruptions has been decomposed into four generic repair actions that can be applied singularly or in combination. These generic repair actions are evaluated through a simulation study with the performance measures of efficiency and stability. The results indicate the effectiveness of the mAOR heuristic in dealing with typical job shop disruptions.
Singapore-MIT Alliance (SMA)