Please use this identifier to cite or link to this item:
http://dspace.mediu.edu.my:8181/xmlui/handle/2374.OX/1376| Title: | A Fast Mail Doubleheader |
| Keywords: | Lake Shore &amp Michigan Southern Railway Railroad Bridge - Ohio - Sandusky Bay Sandusky River (Ohio) |
| Issue Date: | 16-Oct-2013 |
| Publisher: | Rutherford B. Hayes Presidential Center |
| Description: | Double heading a train required highly skilled engineers. The engineer on the second engine didn't open the throttle until the first engine put the train in motion. |
| URI: | http://koha.mediu.edu.my:8181/xmlui/handle/2374 |
| Other Identifiers: | 1083.13.5.1 13 http://hdl.handle.net/2374.OX/1376 |
| Appears in Collections: | OhioLINK |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
